Top Drive Removal

Scope

Carry out removal of the crown block, travelling block, top drive and drill string compensator.

Disconnect and remove the high pressure, air, hydraulic and electrical service loops and prepared all equipment for ssafe back-load from the WellSafe Guardian to the MRDS workshop for repair and recertification.

Additional Scopes

Under-deck DROPS survey and load-test of drill floor winches.

Team Assembly

The rope access team consisted of Construction Foreman, Welder, Rigger, Electrician and NDT Technician.

Our multi-skilled team model mitigated the need for mobilising additional personnel and equipment.

Equipment was sent to MRDS workshop where we have qualified oilfield equipment mechanical , hydraulic and electrical technicians

Outcome

All works were carried out on time and within budget with no downtime, FAC’s or LTI’s.

Client Feedback

“They certainly impressed me with their can-do attitude, excellent strong work ethics and eagerness to assist any other department when requested. The amount of work they achieved (most of which had a high potential for injury or major dropped object), to have completed this without one single incident is testament to the level of leadership, teamwork and communication displayed by the MRDS employees.  Having had to reassess the task and look at alternative ways to complete the operation, presented certain challenges. This was handled with the highest level of professionalism at all times.  Their experience and knowledge were vital to ensuring that the operation continued without the need for a project shutdown.”