May
27
2021
Cat IV overhaul of TDS4H top drive. This week-long project was delivered on time and under budget.
Apr
26
2021
Carry out the removal of the crown block, travelling block, top drive and drill string compensator. “They certainly impressed me with their can-do attitude,
Apr
22
2021
Annual 2020 shutdown of Dunlin Alpha platform in the North Sea. “There were a lot of work scopes completed within a very challenging timescale,